Home  >  Article  >  Technology peripherals  >  Shandong Weifang to Yantai high-speed railway starts joint debugging and testing: the design speed is 350 kilometers per hour, and the countdown to operation begins

Shandong Weifang to Yantai high-speed railway starts joint debugging and testing: the design speed is 350 kilometers per hour, and the countdown to operation begins

WBOY
WBOYOriginal
2024-07-18 12:41:24890browse

News from this site on July 13. According to "CCTV News", at 8:00 on July 13, the joint commissioning and commissioning of the Weifang-Yantai High-speed Railway (hereinafter referred to as the "Weiyan High-speed Railway") was officially launched, and the countdown to operation has entered.

山东潍坊至烟台高铁启动联调联试:设计时速 350 公里,通车运营进入倒计时


The main line of Weiyan High-speed Railway is 237.3 kilometers in length, design speed is 350 kilometers per hour. The line passes through Changyi City in Weifang, Pingdu City in Qingdao, Laizhou City, Zhaoyuan City, Longkou City, Penglai District, Development Zone, Fushan District and Zhifu District in Yantai. Construction of the line started in December 2020, and static acceptance will be completed in early July 2024.
The entire line has Changyi, Huibu, Laizhou, Zhaoyuan, Longkou City, Penglai City, Yantai West, Fushan, Zhifu, Yantai South 10 stations. Among them, Huibu Station, Laizhou Station, Zhaoyuan Station, Yantai West Station and Fushan Station are five new stations.
The relevant person in charge of Shandong Weiyan High-speed Railway Company said that the Weiyan High-speed Railway has 88 bridges and 8 tunnels, of which the longest tunnel is the 1981-meter Lingshan Tunnel. At present, all projects have completed static acceptance, all equipment rooms have been put into use, and the production and living houses are ready for occupancy and have the conditions to start joint debugging and testing.
This site has learned that the Weiyan High-speed Railway is an important part of the coastal corridor of the national "Eight Vertical and Eight Horizontal" high-speed railway network. After completion, it will be connected to the Qingrong Intercity and Weirong High-speed Railway, and the Jiaodong Peninsula will realize a high-speed rail loop.

The above is the detailed content of Shandong Weifang to Yantai high-speed railway starts joint debugging and testing: the design speed is 350 kilometers per hour, and the countdown to operation begins. For more information, please follow other related articles on the PHP Chinese website!

Statement:
The content of this article is voluntarily contributed by netizens, and the copyright belongs to the original author. This site does not assume corresponding legal responsibility. If you find any content suspected of plagiarism or infringement, please contact admin@php.cn