Home  >  Article  >  Technology peripherals  >  Gansu's new energy installed capacity exceeded 40 million kilowatts, and the first energy storage power station grid connection adaptability test was completed

Gansu's new energy installed capacity exceeded 40 million kilowatts, and the first energy storage power station grid connection adaptability test was completed

WBOY
WBOYforward
2023-09-13 18:37:081357browse

According to news from this website on September 10, according to CCTV reports, the first test of the grid adaptability of Gansu energy storage power station was successfully completed today (10th) at Sanduntan, Nangu Town, Minle County, Zhangye, Gansu Province, at an altitude of about 1,700 meters.

甘肃新能源装机规模突破 4000 万千瓦,首次储能电站并网适应性检测完成

According to reports, Gansu Province’s new energy installed capacity has exceeded 40 million kilowatts, accounting for more than 55% of the province’s total power installed capacity. The proportion of total installed capacity ranks second in the country.

According to the public information on this site, Gansu Province has now built a wind power base with a 10 million kilowatt level in Jiuquan and four photovoltaic bases with a 1 million kilowatt level in Zhangye, Jinchang, Wuwei and Jiuquan

In 2022, Gansu Province's new energy power generation will reach 49.5 billion kilowatt-hours, a year-on-year increase of 20.71%, accounting for 27.6%, a year-on-year increase of 4.31 percentage points. The proportion of new energy installed capacity reached 50.19%, a year-on-year increase of 6.64 percentage points, making it the largest power source in the province. At the same time, electricity was delivered to 21 provinces, and the electricity delivered across provinces and regions throughout the year reached 56.07 billion kilowatt-hours, a year-on-year increase of 8.3%

Advertising statement: This article contains external jump links (including but not limited to Hyperlinks, QR codes, passwords, etc.) are designed to provide more information and save screening time. The results are for reference only. Please note that all articles on this site contain this statement

The above is the detailed content of Gansu's new energy installed capacity exceeded 40 million kilowatts, and the first energy storage power station grid connection adaptability test was completed. For more information, please follow other related articles on the PHP Chinese website!

Statement:
This article is reproduced at:ithome.com. If there is any infringement, please contact admin@php.cn delete