Home  >  Article  >  Technology peripherals  >  Lenovo builds a new factory in Tianjin: investment exceeds 1.8 billion yuan, with an annual output of 3 million computers and smart devices in the future

Lenovo builds a new factory in Tianjin: investment exceeds 1.8 billion yuan, with an annual output of 3 million computers and smart devices in the future

WBOY
WBOYforward
2023-11-08 15:21:37923browse

According to news from this site on November 8, this site officially learned from Lenovo Group that On November 6, Lenovo Group Innovation Industrial Park (Tianjin) was fully completed. The industrial park is located in the Airport Economic Zone of Tianjin Port Free Trade Zone, covering an area of ​​112,000 square meters, with a total investment of over 1.8 billion yuan. It will create employment for more than 1,000 people in the Beijing-Tianjin-Hebei region, and will produce 3 million computers and intelligent equipment annually in the future.

Lenovo builds a new factory in Tianjin: investment exceeds 1.8 billion yuan, with an annual output of 3 million computers and smart devices in the future

According to reports, the main positioning of the industrial park is "green zero-carbon, intelligent manufacturing", integrating production and manufacturing, R&D experiments and digital display. Integrated, committed to creating a highly automated, fully intelligent and replicable zero-carbon intelligent manufacturing solution

The industrial park has 30,000 square meters of distributed photovoltaic panels laid on the roofs of three production buildings,The total annual power generation is more than 5 million kilowatt-hours, which is equivalent to the annual consumption of 2,000 ordinary households. This move will reduce the carbon footprint of the park by 3,000 tons.

Lenovo builds a new factory in Tianjin: investment exceeds 1.8 billion yuan, with an annual output of 3 million computers and smart devices in the future

Innovation Industrial Park (Tianjin) has been upgraded based on Lenovo’s intelligent manufacturing experience, and ultimately achieved a high degree of automation and comprehensive intelligence, is known as A laptop comes off the assembly line every 9 seconds, with an annual output of over 3 million units. The automation rate of the smart notebook production line reaches 60%, ranking first in the industry; the intelligent high-speed patch production line has an automation rate of 80%, including the automation rate of the patch segments. Reaching 92%, the component placement speed can reach 172,000 per hour.

Lenovo builds a new factory in Tianjin: investment exceeds 1.8 billion yuan, with an annual output of 3 million computers and smart devices in the future
#At the same time, some important links in production have been fully automated and unmanned. In the notebook production line testing section, Lenovo Group’s independently developed fully automatic testing system can test more than 150 items in 8 categories within 2 hours, and the whole process is 100% black-light capable; in the packaging section, materials are automatically distributed. The process is unmanned.

Currently, Lenovo Group is moving towards its third goal of "1,000 people and 10 billion" in Tianjin, that is, more than 3,000 employees, revenue of more than 30 billion yuan, and industrial output value of 10 billion yuan

.

Advertising statement: The external jump links (including but not limited to hyperlinks, QR codes, passwords, etc.) contained in the article are used to convey more information and save selection time. The results are for reference only. All articles on the site contain this statement.

The above is the detailed content of Lenovo builds a new factory in Tianjin: investment exceeds 1.8 billion yuan, with an annual output of 3 million computers and smart devices in the future. For more information, please follow other related articles on the PHP Chinese website!

Statement:
This article is reproduced at:ithome.com. If there is any infringement, please contact admin@php.cn delete