Home  >  Article  >  Technology peripherals  >  Guangzhou East Railway Station will be upgraded to a high-speed rail station: parallel to the Guangzhou-Shenzhen Railway and connected to the Guangzhou-Shantou High-speed Railway

Guangzhou East Railway Station will be upgraded to a high-speed rail station: parallel to the Guangzhou-Shenzhen Railway and connected to the Guangzhou-Shantou High-speed Railway

WBOY
WBOYforward
2023-10-16 15:57:071117browse

According to news from this site on October 16, Guangzhou Railway Group recently released the "Draft for Environmental Impact Assessment of the New Guangzhou Railway Hub Guangzhou East Station to Xintang Station Line 5-6 Project", Guangzhou East Station to Xintang Station Line 5-6 The total construction period of the line project is 5 years.

The main projects include the upgrading and reconstruction project of Guangzhou East Railway Station. Guangzhou East Railway Station will reconstruct the station according to the "ground and underground through-park" double-decker parking plan. After the renovation, Guangzhou East Railway Station has been upgraded to a high-speed rail station. The total size of the station is 14 platforms, which is doubled from the current 7 platforms.

Guangzhou East Railway Station will be upgraded to a high-speed rail station: parallel to the Guangzhou-Shenzhen Railway and connected to the Guangzhou-Shantou High-speed Railway
Picture source Guangzhou Railway
This station noticed that the fifth and sixth line projects from Guangzhou East Station to Xintang Station are located in Guangzhou City Within Tianhe District, Huangpu District and Zengcheng District, it starts from Guangzhou East Station in the west and ends at Xintang Station in the east.

runs parallel to the existing Guangzhou-Shenzhen Railway. The total length of the main line of Guangzhou East to Xintang Line 5 and 6 Project is 30.014km.

Guangzhou East Railway Station will be upgraded to a high-speed rail station: parallel to the Guangzhou-Shenzhen Railway and connected to the Guangzhou-Shantou High-speed Railway

Guangzhou East Railway Station will be upgraded to a high-speed rail station: parallel to the Guangzhou-Shenzhen Railway and connected to the Guangzhou-Shantou High-speed Railway
## Relevant projects include the reconstruction of Guangzhou-Shenzhen Lines I and II in the section from Guangzhou East to Shipai The track length of the line is 4.647km, the length of the converted Guangshen Line III in the section from Guangzhou east to Shipai is 4.653km, the length of the converted Guangzhou-Shenzhen Line IV in the section from Guangzhou east to Shipai is 4.497km, the length of the reconstructed line of Lines 1 and 2 is 2.682km and the length of Line 3 is 2.682km. The new line is 3.055km long.

The entire line has two stations, Guangzhou East and Xintang.

Among them, Guangzhou East Station is a reconstruction of an existing station, Xintang Station is a station under construction on the Guangzhou-Shantou Railway, and a Huangpu Station is reserved on the line

. The Guangzhou East Railway Station was renovated into 14 stations with 24 lines, including 8 stations with 14 lines in the ground yard and 6 stations with 10 lines in the underground yard. The current scale is 7 stations with 16 lines (including 4 main lines). The main rail transit around Guangzhou East Station includes Metro Lines 1 and 3 and the under-construction Metro Lines 11 and 18.

Advertising statement: The external jump links (including but not limited to hyperlinks, QR codes, passwords, etc.) contained in the article are used to convey more information and save selection time. The results are for reference only. All articles on the site contain this statement.

The above is the detailed content of Guangzhou East Railway Station will be upgraded to a high-speed rail station: parallel to the Guangzhou-Shenzhen Railway and connected to the Guangzhou-Shantou High-speed Railway. For more information, please follow other related articles on the PHP Chinese website!

Statement:
This article is reproduced at:ithome.com. If there is any infringement, please contact admin@php.cn delete