Home > Article > Technology peripherals > my country's "Haiyang Geizhi No. 26" research vessel completed its first "ship-loading" combined sea trial
News from this site on July 27. According to CCTV News yesterday (July 26), the "Haiyang Dizhi No. 26" survey ship completed its first "ship installation" combined sea trial in the Qiongzhou Strait after commissioning. . Introduction to the "Haiyang Dizhi No. 26" research vessel The "Haiyang Dizhi No. 26" research vessel project was launched in October 2020, and the design plan was approved in November 2021. Construction will begin in July 2022, and it will be launched in December 2023. , which will complete comprehensive sea trials and other work in April 2024, is a new multi-functional scientific survey ship positioned for comprehensive geological survey and research of islands (reefs), and is affiliated to the China Geological Survey of the Ministry of Natural Resources.
The ship has a gross tonnage of 1311, a total main engine power of 2426 kilowatts, a ship displacement of 1713 tons, a total hull length of 63.5 meters, a molded width of 12.6 meters, a molded depth of 4.6 meters, a draft of 3.2 meters, a crew of 34 people, a self-sustainability of 35 days, and an endurance of 3500 nautical miles. The entire ship is propelled by dual-machine full-rotation rudder propellers, equipped with a bow thruster and a DP1 dynamic positioning system, and has good stability, maneuverability and seaworthiness.The above is the detailed content of my country's "Haiyang Geizhi No. 26" research vessel completed its first "ship-loading" combined sea trial. For more information, please follow other related articles on the PHP Chinese website!