Home >Backend Development >C++ >Minimum number of sides needed to form a triangle

Minimum number of sides needed to form a triangle

王林
王林forward
2023-08-25 21:05:22932browse

Minimum number of sides needed to form a triangle

To determine the minimum number of sides required to form a triangle in a diagram, we analyzed the network between centers. A triangle can be formed where three hubs are related exclusively or in a roundabout way by edges. The minimum number of edges required is equal to the number of edges lost in the existing connections between the three hubs. By looking at the graph and distinguishing the unrelated centers, we can calculate the number of extra sides needed to form the triangle. This method is different because it requires minimal adjustments to create a triangular relationship between the centers in the chart.

usage instructions

  • Graph traversal method

Graph traversal method

Graph traversal methods for finding the minimum number of sides required to create a triangle involve studying the graph using traversal computations such as depth-first search (DFS) or breadth-first search (BFS). Starting from each center in the graph, we navigate its adjacent centers and check whether there is a path of length 2 between any matches of adjacent centers. If such a method is found, we have found a triangle. By re-doing this preparation for all centers, we will determine the minimum number of additional sides required to form at least one triangle in the diagram. This approach effectively studies the graph structure to differentiate triangles and minimize the number of included sides.

algorithm

  • Make a contagious list or grid representation of your chart.

  • Initialize the variable minMissing to store the minimum number of missing edges.

  • Iterate over each center in the chart:

  • Use depth-first search (DFS) or breadth-first search (BFS) to start graph traversal from the current center.

  • For each neighboring hub j of the current hub, navigate its neighbor k and check if there is an edge between j and k.

  • If there are no edges between j and k, calculate the number of sides lost when creating the triangle by subtracting the number of existing sides from 3.

  • Use the current minMissing and minMissing with the fewest missing edges to upgrade minMissing.

  • After repeating the operation for all centers, the value of minMissing will represent the minimum number of sides required to create the triangle.

  • Return the respect of minMissing.

Example

#include <iostream>
#include <vector>
#include <queue>

int minimumMissingEdges(std::vector<std::vector<int>>& graph) {
    int minMissing = 3; // Variable to store the least number of lost edges

    // Iterate over each hub in the graph
    for (int hub = 0; hub < graph.size(); ++hub) {
        std::vector<bool> visited(graph.size(), false); // Mark nodes as unvisited
        int lostEdges = 0; // Number of lost edges to form a triangle

        // Begin chart traversal from the current hub utilizing Breadth-First Search (BFS)
        std::queue<int> q;
        q.push(hub);
        visited[hub] = true;

        while (!q.empty()) {
            int currentHub = q.front();
            q.pop();

            // Check neighbors of the current hub
            for (int neighbor : graph[currentHub]) {
                // Check if there's an edge between the current hub and its neighbor
                if (!visited[neighbor]) {
                    visited[neighbor] = true;
                    q.push(neighbor);
                    // If there's no edge between the current hub and its neighbor, increment lostEdges
                    if (!graph[currentHub][neighbor]) {
                        lostEdges++;
                    }
                }
            }
        }

        // Update minMissing with the least of the current lost edges and minMissing
        minMissing = std::min(minMissing, lostEdges);
    }

    return minMissing;
}

int main() {
    // Example usage
    std::vector<std::vector<int>> graph = {
        {0, 1, 1, 0},
        {1, 0, 0, 1},
        {1, 0, 0, 1},
        {0, 1, 1, 0}
    };

    int minMissingEdges = minimumMissingEdges(graph);
    std::cout << "Minimum number of edges to form a triangle: " << minMissingEdges << std::endl;

    return 0;
}

Output

Minimum number of edges to form a triangle: 0

in conclusion

The focus of this article is to find the minimum number of sides required to create a triangle in a given graph. It uses the graph traversal method as a strategy to determine the minimum number of extra edges required to form the shortest triangle in the graph. This approach involves using traversal algorithms such as depth-first search (DFS) or breadth-first search (BFS) to navigate the graph.

Starting from each hub in the graph, investigate adjacent hubs and check if there is a path of length 2 between any matches of adjacent hubs. If such a path is found, a triangle will be formed. By rehashing this handle for all centers, the calculation determines the minimum number of additional sides required to form the triangle. This article gives detailed calculations and C code examples for implementing the graph traversal method. Understanding and applying this method can skillfully ensure the required edges to form triangles in different chart structures.

The above is the detailed content of Minimum number of sides needed to form a triangle. For more information, please follow other related articles on the PHP Chinese website!

Statement:
This article is reproduced at:tutorialspoint.com. If there is any infringement, please contact admin@php.cn delete