Home  >  Article  >  Technology peripherals  >  The Gui-Li section of the Guinan High-speed Railway is open to traffic, and the shortest time from Guiyang to Libo is 57 minutes

The Gui-Li section of the Guinan High-speed Railway is open to traffic, and the shortest time from Guiyang to Libo is 57 minutes

WBOY
WBOYforward
2023-08-13 16:29:04928browse

News from this site on August 8, China Railway announced that at 6:21 on August 8, the first high-speed train D6171 on the Guiyang-Libo section of the Guinan High-speed Railway will depart from Guiyang North Station to Libo Station. This marks the official opening of the Guili section of the Guinan High-speed Railway. Guiyang to Libo can reach in 57 minutes at the fastest speed.

The Gui-Li section of the Guinan High-speed Railway is open to traffic, and the shortest time from Guiyang to Libo is 57 minutes
Source China Railway Official Account

This site learned from the China Railway Official Account that the Guinan high-speed rail line starts from the Guiyang Railway Hub It leads out from Longli North Station, passes south through Qiannan Buyi and Miao Autonomous Prefecture in Guizhou Province, Hechi City and Nanning City in Guangxi Zhuang Autonomous Region, and connects to Nanning Railway Hub Nanning East Station. The total length of the line is 482 kilometers, with a design speed of 350 kilometers per hour. ##. Guinan High-speed Railway is the first high-speed railway between Guizhou and Guangxi with a design speed of 350 kilometers per hour. Once completed and opened to traffic, the time required from Guiyang to Nanning will be shortened by about half,

The fastest is about 2 hours It can be reached (now it takes more than 5 hours).

The Gui-Li section of the Guinan High-speed Railway is open to traffic, and the shortest time from Guiyang to Libo is 57 minutes
The newly opened section this time is the section from Longli North Station to Libo Station, a total length of 175 kilometers

, there are 5 stations in Longli North, Guiding County, Duyun East, Dushan East, and Libo. Among them, Longli North, Guiding County, and Duyun East are renovated and expanded stations, and Dushan East and Libo are newly built stations. . Please note: The external links (including but not limited to hyperlinks, QR codes, passwords, etc.) contained in this article are intended to provide more information to save you screening time. Please note that the results provided by the link are for reference only and all articles on this site contain this statement

The above is the detailed content of The Gui-Li section of the Guinan High-speed Railway is open to traffic, and the shortest time from Guiyang to Libo is 57 minutes. For more information, please follow other related articles on the PHP Chinese website!

Statement:
This article is reproduced at:ithome.com. If there is any infringement, please contact admin@php.cn delete